Structural steel support frame for an industrial plant upgrade, including base plates, columns and bracing.

Discuss a Similar ProjectRequest a Quote

The Challenge

A process plant needed a new steel support frame for upgraded equipment. The existing structure was occupied, and the new frame had to fit between existing pipework and services with minimal tolerance. The engineering drawings were detailed, but site access was limited — components had to be small enough to be manoeuvred through an existing doorway.

Our Solution

We broke the frame into transportable sections that could be bolted together on site. We laser-cut and welded columns, beams and bracing in-house, punched all connection holes to match the drawing, and hot-dip galvanised through our partner for corrosion protection. Each section was numbered and tagged. On site, the erectors bolted the sections together without re-drilling, even around the existing services.

The Results

The frame was erected in a single day, with no on-site modification needed. The galvanised finish is holding up well in the plant environment, and the client has used us for two more structural packages since.

Steel column base plate detail
Close-up of the base plate — galvanised, anchor bolts, ready for grouting.

Project Specifications

  • Material: 75x75x5 SHS columns, 150x75x5 RHS beams, 10mm base plates
  • Height: 3.6m support frame, two levels
  • Connections: M20 bolted connections, punched to match drawing
  • Finish: Hot-dip galvanised after fabrication
  • Sections: 6 transportable modules, bolted on site
  • Lead time: 4 weeks from drawing approval to delivery

Why modular sections mattered

The plant was operational, and access to the installation area was through a single 1.2m-wide doorway. A single welded frame would have been impossible to manoeuvre into place. We broke the structure into six transportable modules that each fit through the doorway, then bolt together on site using engineered connection plates. The erectors carried each section in by hand, positioned them, and bolted the whole frame together in a single day.

Galvanising was specified by the client because the area is a washdown zone — regular hosing and chemical exposure would rust painted steel within a year. Hot-dip galvanising gives a maintenance-free coating that lasts for decades in that environment.